Site and permits
setback
A setback is the area between a property line and a building or structure where building is not allowed. Cornell's Legal Information Institute says it is measured from the property line to any structure, and it may include driveway areas or similar surface improvements. Local zoning sets the required distance.
Why it matters
Setbacks matter when a customer wants to place a container near a fence, a street or a neighbor. Some towns treat a container as a structure and apply setback rules to it, while others do not. A common mistake is to measure from the edge of the road or the sidewalk. The legal line is the property line, which may sit well behind or in front of them. Operators and customers should confirm the setback with the local planning office and mark the drop spot before the truck arrives. A survey or plat can show where the line is.
Read: Permits, zoning, and HOA rules for container rental operators
Definition source: law.cornell.edu
Related terms
zoning ordinance
A zoning ordinance is a local law that controls how land can be used and built on. It divides a city or county into districts and sets which uses, building sizes and activities are allowed in each. Los Angeles describes zoning as turning a city's goals into land use rules.
temporary structure permit
A temporary structure permit is local approval to place a structure on a site for a limited time. Some cities treat portable storage containers as temporary uses and set time limits instead of requiring a full permit. Names and rules differ by city, so the exact permit may have a different title.
HOA covenant
An HOA covenant is a rule in the recorded declaration of a homeowners association, often called CC&Rs for covenants, conditions and restrictions. It limits how owners may use their property. The rules bind all owners in the community and can cover things like parked vehicles, alterations and storage items.
delivery access
Delivery access is the space and route a truck needs to reach the drop spot. It includes the road, driveway, gates, turning room and overhead clearance. XCaliber Container gives a guide of about 10 feet of width on each side of the container and 13 feet of overhead clearance.
site preparation
Site preparation is the work done on a spot before a container arrives. It includes clearing the access path, checking overhead room, making the ground firm and fairly level, and sometimes adding a gravel or stone base. The goal is a safe drop and a unit that sits flat.
For the industry
Grow your portable storage business with NPSA
Members get event rates, the Community Forum, the directory listing and leads from this website.
Need storage?
Get quotes from NPSA member companies
Tell us what you need and where. A member company that serves your area will contact you.
